Monday, March 18, 2013

Week 10 Final Assignment: Final Project

  This week we had to prepare for our final and upon presenting a pre-final project we were working, we had to find the issues that needed fixing.

  My issues with the movie clip of the walk cycle was that, I needed to fix the lighting; the lighting was a bit off and too dark. By fixing that issue, I had to change the color of the front directional lighting that I wanted red and it actually looked more blood orange, I switched it to off white.

  The other problem was that there was no bounce to the walk, which I used my hip controller to give a little bit of a down and up movement to give a more natural walk, and previously I used the pelvic bone to animate the up and down motion which did not work.

Finally, the last problem I had to fix was frame of the video as well as the speed of the walk.  It was too slow because I've used "virtualdub" that I knew could accommodate the .iff batch renders.  Re-batch rendering with  .tiff made the .mov clip used much faster, and using adobe premier made it fast and clear.

Video link. Enjoy!

http://www.youtube.com/watch?v=vZx0RFIckwo

No comments:

Post a Comment